Q3 Build Slots Sold Out -
Design Your Pool
Ecopool S-Series lap pool

Join the Waitlist

Due to unprecedented demand across North America, our manufacturing is at max capacity. Join the queue to claim a build slot.

Join the Waitlist → No cost. No commitment. Immediately locks your timestamp in the Q4 production queue.
Ecopool technician welding a tubular steel pool structure Precision fabrication — Texas facility
Why the List Exists

Driven by Demand.

Every week, hundreds of homeowners reach out about Ecopool — more than our Texas facility can build at one time. Rather than oversell and stretch out lead times, we cap each production run at what we can build to our standards. The waitlist keeps things fair: it's how we make sure every pool gets full attention, and every customer knows exactly where they stand.

How Allocation Works

First Reserved. First Built.

Build numbers and factory delivery windows are assigned strictly by your reservation timestamp, not deposit size or project value.

01

Steel Release

When a run opens, raw steel batches and shop-floor hours are assigned directly to named reservation holders.

02

Batch Lockout

The instant the last unit is claimed, the production ledger locks automatically. Zero units are added to a closed run.

03

Priority Rollover

Unallocated projects automatically move to the front of the next incoming steel release. You never lose your position.

Ecopool inground pool with custom view window Custom view windows & tanning ledges
The Priority Window

48 Hours Before the Public Release.

When a new production cycle opens, active reservation holders receive an exclusive 48-hour access window before any public press or digital release.

During this window, we will reach out to priority holders first, allowing you to finalize your pool length, depth, custom view windows, tanning ledges, filtration packages, and delivery timeline.

What You're Waiting For

Engineered Superiority. Delivered on a Single Truck.

This isn't a traditional 6 month nightmare that turns your yard into a mud pit while contractors miss deadlines.

Engineered tubular steel pool structure
60% Stronger

Than poured concrete, using structural tubular steel.

Crane lowering a complete Ecopool into place
3× Faster

Installation — drop in place, hook up, fill.

Non-porous German Zycore pool interior
75% Easier

To maintain, with non-porous German Zycore™ interior.

Ecopool sited semi-inground on a hillside
Flexible Siting

Inground, above-ground, or flush hill-side semi-inground.

Woman swimming in a black Ecopool architectural pool
Next Steps

Demand for structural steel pools is at an all-time high. A free reservation costs nothing and commits you to zero financial obligation, but it instantly registers your precise position against our factory schedule. That timestamp is the single factor separating the homeowners swimming this season from those on the waitlist.

Claim Your Build Number Now →

Your exact time of entry is logged the second you click submit. Build slots are confirmed following a brief phone call to review and deposit — 100% refundable until you sign the final Purchase Agreement via Docusign.

Join the Waitlist

Reserve Your Build Number

Your position is timestamped the moment you submit. No cost, no commitment — an Ecopool specialist will confirm your slot by phone.